Sunday 5 December 2010

Moodboard

Going to do a full update on monday hopefully, until then heres the moodboard I promised.




Friday 26 November 2010

Week 9 - 22nd to 26th November

This weeks tasks were:
  • Design Templates Finish 23rd November
  • Start Box Model From Templates starts 24th November
Tasks carried over from previous weeks:
  • Concept Art
The Design Templates have been done to a level of detail that a box model would require, but for the high and low poly models, it will require more detail. I will do this for next week as an additional task, by just adding more detail to the current templates.

As the design templates have not been scanned in, the box model could not be started, so will scan them in and post them as soon as they are done. The box model will be started as soon as the templates are scanned in.

No more concept are has been done, but this is a low risk task, so this can be put off until the box model is completed and the tasks for next week have been completed.

Tasks to carry over to next week:
  • Scan templates - High Priority
  • Complete Box model - High Priority
  • More concept art - Low Priority
Matt

Thursday 25 November 2010

Week 8 - 15th to 19th November

Initial Post to show where I am with the tasks for the previous week. In this week these tasks were up:
  • Decide of Type of Snake
  • Research into different Snake body types
  • Design Templates for Snake Starts 15th November
  • Concept art Snake
The Snake type has been decided as an Indian Cobra.

Research from different body types led me to choosing this body type as it seems to be an interesting shape, especially the head arch.

Design Templates had been started on 15th November, but will be talked more about in post for next week.

Some concept art has been done for Snake, but need to do more as reference.

Matt

Wednesday 24 November 2010

New Start

This is a blog for the benefit for my University DIssertation project. Updates on how far I have gotten will be posted on Monday, Wednesday, and Friday, along with screenshots where possible of what work has been done on my part. As well as updates of what has happened over the previous week, there will be a goal system for what has been accomplished over what was meant to be done by now, as well as what the tasks are for the next week. This will be done on Mondays in addition to any work.

First update to come on Friday.

Matt